CONTROVERSY AT GIZA! The Great Pyramid's cost overruns outrage the nomarchs
Circa 2560 B.C. (Reign of Khufu)
MEMPHIS – Construction of Khufu's Horizon (the Great Pyramid) enters its final phase, but not without controversy. What the Pharaoh announced as a "national project of unity" has become a logistical and economic challenge that is draining the grain reserves of the royal granaries.
Politics: Taxes on the Nile
The governors of the southern provinces (the nomarchs) have privately voiced their grievances over the increased quota of workers they must send during the flood season. "My men should be repairing canals, not hauling limestone from Tura," declared an anonymous source close to the court. From the palace of Memphis, however, the vizier Hemiunu insists the budget is under control and that the work is the greatest job creator in history.
Science and DIY: The secret of the ramps
Our correspondent has managed to slip into the construction site. The technological display is overwhelming: the use of internal ramps and a system of wooden pulleys never seen before. The engineers maintain that the precision is such that not even a sheet of papyrus will fit between the granite blocks. "It is a work for eternity; the costs are secondary when it concerns the rest of a God," states Hemiunu.

Society: The "Workers' City" is a success
Not everything is criticism. The new settlement for the builders offers daily rations of top-quality beer, ox meat and free medical care for fractures. It is, quite possibly, the neighborhood with the best healthcare coverage in the ancient world.
Back pain after a day dragging 2-tonne blocks?
The Balm of Anubis: reduces inflammation and leaves you ready for the next shift. Available at the plateau market.
* Donation for the Pultsar News project
Comentarios ()